Project Name
Data Centre, Drogheda
Role
Roofing and cladding subcontractor
Category
Data Centre
Scope
Installed 11,000m2 of a Soprema felt system on top of a metal deck. We installed 7500m2 of KS panel on the walls and some of this was architectural KS FL panel. 5 ancillary buildings completed with the same build-up on the roof and walls. At a later stage ACB Group were awarded an additional package for the Lourves and plant screen mesh due to outstanding performance and Value Engineering options on the contract.
Scale
11,846m2
Products/ Systems Used

Soprema Metal deck & felt build up. Used a mini mammoth machine. Walls – and Kingspan Architectural and KS RW

Client
John Paul Construction
Why ACB Group was chosen:
ACB Group were chosen for this project thanks to our early engagement and problem-solving at the design phase. Whilst working on the project, ACB Group’s Power Team came up with innovative solutions for the roof boxes, which saved time and reduced costs to the client.