Drogheda Data Centre
Client: John Paul Construction
Scope: External Envelope Contractor
Scale: 11,846m2
ACB Group Installed 11,000m2 of Soprema Felt System on top of a metal deck and 7,500m2 of Kingspan on the walls. Awarded and installed a louvre and plant screen mesh package due to outstanding on-site performance.

Dublin Data Centre
Client: Jones Engineering
Scope: External Envelope
Scale: 4,500m2
ACB Group Installed 4,500m2 of Sika Single Ply Membrane roof and 4,000m2 of Eurobond wall cladding. Installed 650m2 rainsceeen and 250m2 Curtain Walling, as well as 450m2 Glass Canopies and Profilit Glazing.

Grange Castle Data Centre
Client: Structure Tone
Scope: External Envelope
Scale: 8,147m2
ACB Group installed 9,000m2 of Sika Sarna Single Ply Membrane roof and 8,500m2 Eurobond wall cladding. Installed 630m2 of Fibre Cement rainscreen and 900m2 of Expanded Mesh Aluminium Screen.

Dublin Data Centre
Client: Confidential
Scope: External Envelope
Scale: 10,900m2
ACB Group installed 4,600m2 of an Icopal warm roof built up system, 4,000m2 of a Kingspan Architectural wall panel system and 900m2 of Kingspan Louvre panel systems to the data centre. ACB also installed 1,400m2 of an Architectural panel and window system to the office block as well as 600m2 of plant screen system at roof level and over 300 penetrations at roof level.

Ballycoolin Dublin Data Centre
Client: John Paul Construction
Scope: External Envelope
Scale: 4,500m2
ACB Group installed 4,500m2 of Trimo wall panels, 4,300m2 of a Monolithic Inverted roof deck system as well as 3,700m2 Moy Materials Warm Deck roof system.

Frankfurt Data Centre
Client: Mercury
Scope: External Envelope
Scope: 4,699m2
ACB Group Installed 3,100m2 of Soprema Felt roof build-up and 7,500m2 Trimo Composite wall panels. 400m2 of Green roof installed.

Frankfurt Data Centre
Client: Mercury
Scope: Roofing Contractor
Scale: 11,599m2
Installed 11,599m2 of Soprema Felt roof with a leak detection system including smoke vents, drainage outlets and downpipes. Fall arrest system installed with an additional package of plant access boxes.

Copenhagen Data Centre
Client: Mercury
Scope: External Envelope
Scale: 3,499m2
ACB Group Installed 4300m2 of Bauder felt roof system and a specially procured and value-engineered Favemac brick cladding system of 4,300m giving the client significant cost savings.

Berlin Data Centre
Client: Mercury
Scope: External Envelope
Scale: 5,600m2
ACB Group Installed 5,600m2 of Sika single-ply roof and 4,500m2 0f Trimo wall cladding. There was also 570m2 and Kawneer Curtain Walling installed on the project. ACB also installed the doors, plant screen, and vestibule entrance to the data centre.

Berlin Data Centre
Client: Mercury
Scope: External Envelope
Scale: 4,699m2
ACB Group installed 5,500m2 of a Moy Materials roof build-up. There was 4,300m2 of Trimo Wall Cladding installed as well as plant screen, doors and 550m2 of Curtain Walling. ACB also installed the vestibule entrance to this Berlin data centre.